Improved traffic flow, accessibility and safety on the A12
A rush-hour lane and three weaving lanes in both directions on the A12 motorway between Veenendaal and Ede-Wageningen were needed in order to provide a better flow of traffic, improve regional accessibility and enhance road safety. A number of bridges were also replaced, ecological and fauna provisions provided, a tunnel lengthened, noise abatement facilities installed and traffic signalling placed above the motorway. Iv-Infra provided the entire package of surveying work and was responsible for part of the road design, including water management and a greenery plan.