Petrocom Energy Limited is building coal blending facilities (CBF) at twenty locations throughout China. Each of these locations will have six concrete silos with a storage capacity of 45,000 m³. Petrocom chose Iv-Consult as the engineering firm because of its experience in designing and engineering coal blending facilities (for clients including the Rotterdam-based transhipment company EMO).
At Petrocom's request, Iv-Consult set up the entire logistics process required for the new CBFs, with capacities ranging from 10 to 12 million tons per year. lv-Consult also took over the entire conception – from initial draft to final design – based on Chinese standards in an earthquake-prone area.

For more information, please contact:
Iv-Consult b.v.
Ageet Adriani MSc
Office manager
Phone +31 (0)78 644 85 55
Email mail@iv-consult.nl